How long does the installation process take?
Typically, the entire concrete lifting process can be completed within a day, depending on the severity of the damage and the scope of the job. The PolyRenewalâ„¢ injected foam cures in 15 minutes, so you can use the surface shortly after. Dry Pro experts will provide an accurate installation timeline during a free inspection appointment.

Our Locations
Charlotte, NC
130 Performance Dr
Belmont, NC 28012
Matthews, NC
1312 Matthews-Mint Hill Rd.
Matthews, NC 28105
