Skip to Main Content
Stabilizer Adjustment

How long does the installation process take?

Typically, the entire concrete lifting process can be completed within a day, depending on the severity of the damage and the scope of the job. The PolyRenewalâ„¢ injected foam cures in 15 minutes, so you can use the surface shortly after. Dry Pro experts will provide an accurate installation timeline during a free inspection appointment.

DryPro Service Map

Our Locations

Charlotte, NC

130 Performance Dr
Belmont, NC 28012

Matthews, NC

1312 Matthews-Mint Hill Rd.
Matthews, NC 28105